RCU Forums - View Single Post - Laser Models Laser 3D Building Log
View Single Post
Old 11-21-2002 | 03:02 AM
  #18  
mike98624
Senior Member
 
Joined: Oct 2002
Posts: 166
Likes: 0
Received 0 Likes on 0 Posts
From: Milford, NJ
Default Laser Models Laser 3D Building Log

o boy! next comes the imfamous leading edge sheeting (after the trailing edge sheeting)! the trailing edge is cake, but i had a horrible time with the leading edge. one-side-bevel the sheeting where it hits the le blocks, and use 30 in. epoxy to do it. makes a nice clean job. i got everything to stock down all the way up/down the ribs by wrapping it tightly in masking tape with blocks a little less than half-way up the rib. this made for a nice, solid fit with no bubbles or anything. try it if your not sure, or even if you are (i thought i was sure the first time; i was very wrong) keep up the good work!

Crazy Mike