RE: Pushrod installation ? Need to glue tubes ?
It is very important (if you do not want surface blowback or flutter) to anchor the sheath every 6 inches or so inside the fuselage.Only the end points need to be glued, just restrain the sheath from moving laterly or vertically every 4 to 6 inches.