2 meter plans
Thanks, Gerald.
I'm going to install a Webra 1.45.
I almost feel like I should apologize for the slow progress. Work and good flying weather are slowing me down. When I started it, I thought it would be completed by now. The only building left is to install the cowl, second half of wing sheeting and make the ailerons and wing tips. Then final sanding and covering. Doesn't sound like much, but it's been my experience that everything takes longer than you think it will. Looks like it will be complete sometime in June.
Anyone have any suggestions on installing the canopy on the frame in a way so the canopy material is flush with the wood of the frame? Or should it just overlap the wood and be sealed with a strip of covering? How do you handle this?
Dave