2 meter plans
Yeah, I've been goofing off flying and maintaining my fleet.
The T2K is nearly done. I've covered the wings and horizontal stab. Nosering, remote glow, receiver, batteries and switches are installed etc. (I decided to go with two batteries and two heavy duty switches after a friend lost his 2 meter ship due to a bad switch.) The fuse is basically done and just needs to be finished. Prime and paint the cowl and wheel pants and reassemble. Break in the engine and I'm in business.
I got a lot of inspiration at the Glen, NY pattern meet last week where there were several Typhoons as well as many other really nice planes.
This project is dragging much longer than I expected. I'll post photo's of the completed plane soon.