RCU Forums - View Single Post - 40% Extra 300 Construction by-the-numbers
Old 04-22-2006 | 07:37 PM
  #10  
Don Szczur's Avatar
Don Szczur
My Feedback: (1)
 
Joined: Jan 2002
Posts: 2,177
Likes: 0
Received 16 Likes on 15 Posts
From: Chantilly, VA
Default RE: 40% Extra 300 Construction by-the-numbers

Canopy deck sticks are glued in, then the 6 tabs for the mounting blind nuts. A 3/8 spacer is glued in at each location. Finally sheeting is glued on. Make sure you sheet on a flat surface so the deck will not warp. I used wood glue for the stringers and then thick CA on the edges. After wetting the balsa on the outside, it provides for bending of the bala at the bottom part.
Attached Thumbnails Click image for larger version

Name:	Fd91396.jpg
Views:	66
Size:	24.0 KB
ID:	449646   Click image for larger version

Name:	Wr55547.jpg
Views:	75
Size:	21.2 KB
ID:	449647   Click image for larger version

Name:	Yd81570.jpg
Views:	78
Size:	19.1 KB
ID:	449648   Click image for larger version

Name:	Zt52760.jpg
Views:	68
Size:	27.6 KB
ID:	449649   Click image for larger version

Name:	Qb36382.jpg
Views:	59
Size:	27.5 KB
ID:	449650   Click image for larger version

Name:	Lc49322.jpg
Views:	68
Size:	21.3 KB
ID:	449651