RE: Midwest Extra 300xs Build
Well, I Worked on the aileron control rods today. Had to rubber band them together while the JB weld dried, they were longer than the small vice opening that I used on the elevator linkage. These linkages are pretty close to the final lengths but some adjustments will most likely be made during final setup. All depends on how well the hinge gluing goes. The last pic shows the finished product installed.