Blisster, here is a pic just in case the mental pic isnt comming to ya

here you can see the two 8-32 rods next to the two stock wooden dowls, and where they come out inside the cooling ramp. pretty simple and never failed again.i drilled the holes and tapped with my 8-32 drill and tap set then soaked the rod and filled the hole with 30 min epoxy then screwed them in