RCU Forums - View Single Post - Equipage Venice 90 Rigging
View Single Post
Old 07-16-2006 | 07:05 PM
  #40  
Kmot's Avatar
Kmot
My Feedback: (24)
 
Joined: Jun 2003
Posts: 10,963
Received 5 Likes on 5 Posts
From: Northridge, CA
Default RE: Equipage Venice 90 Rigging

I cut the engine instrument gauge bezels today. After the first batch of 10, and digging through the chips to find them, I got smart and used a paper cup to catch them.



The bezels, in two sizes. 1/2" and 5/16"



This is the basic idea. The bezels are nowhere near finished. They will be polished and smoothed over.







And of course, there will be gauge faces made for them.

I also made some rings with slight knurling on them. Going to make gas caps out of them.