RCU Forums - View Single Post - 40% Extra 300 Construction by-the-numbers
Old 08-04-2006 | 06:55 PM
  #19  
vatechguy3
My Feedback: (11)
 
Joined: Apr 2002
Posts: 1,056
Likes: 0
Received 0 Likes on 0 Posts
From: Smithfield, VA
Default RE: 40% Extra 300 Construction by-the-numbers

why not cut a new root rib with the tube hole correctly located for the 0 dihedral??
wouldn't that be stronger than adding a lite ply plate?

tony