RE: Power and Temp problem figured out???
In most factories, QR get's over shadowed by production...and in this case, I think QC would only be checking that the screws are tight and that it's not cracked after being put together...so Foreign debrie internally at assembly wouldn't surprise me and would be hard to get picked up by the QC dept...That and a lot of factories of non critical components only do sample inspecting...