ORIGINAL: feep
On the subject of BUSA doing SPAD. YIKES How many days will it take to assemble it at the field. Four sets over interplane struts! If I were to do a SPAD I think I would consider a scale that I could transport without taking apart.
The Snipe is also a two-bay fighter. Donnie did his Spad with the wings as already assembled and rigged box-kite like plug-ins. I'm hoping to be able to do something similar on my Snipe. All you really need is a frame to plug the wings into during transport so that at the field all you need to do is remove the frame plug in the wing sets and run a couple of rigging lines.