RE: Nosen P-47 Build Marathon
Here, you can see the doublers and cutouts for the gear and wheels. W3, W4, W5 are doubled on one side with 1/8” balsa. W6 is doubled on one side with 1/8” lite ply. W7, W8 are doubled on two sides with 1/8” lite ply. W9 is doubled on one side with ¼” birch ply. Here you can also see some of the wire ties that I used to hold up the bottom spars in place while I glued them.