Originally posted by MarkNovack
We will lay three laminates per side, each impregnated with 24 hour epoxy, however, we can do two laminates per day because each will be dry enough to feather the LE edge to receive the overlap.
Mark, is it possible to show a close up of the feathering on the LE ? Thanks......