Windbuster:
The first DA-50 was shipped last week, ZDZ-50 maybe 2 months ago. These things are too new to have any long term data on reliability or problems. You'll be lucky to get bench performance test results. Maybe the guys in Canada can install these engines in their snowblower and report back?