RE: SIG Fourstar 40 (4*) Build Thread
I test fitting the tail feathers and measured the length of the push rods for connection to the rudder and elevator.
I then routed the throttle cable and fuel lines through the firewall.
Former F2 had to be notched to allow throttle cable to pass through.