RCU Forums - View Single Post - Stingray Construction
View Single Post
Old 03-01-2003 | 02:01 PM
  #21  
JPOFL
Senior Member
My Feedback: (36)
 
Joined: Feb 2002
Posts: 257
Likes: 0
Received 0 Likes on 0 Posts
From: Ocoee, FL
Default Stringray

Ok The arrow is pointing to a accest panal for the Wires and tubeing going to the turbine. As far as the speedbrake opening forward.Had to do on how I was going to open the speedbrake. See everything has to be mounted on the outside,because with the Jet Tech fuel cells.There is no room to install anything under them. I might add the speedbrake I was talking about pushing the aircraft down and to the right was the one on TOP. Which I do not use any more.In fact I removed the servo that drove it.
Paul Hopkins JPOFL
Attached Thumbnails Click image for larger version

Name:	59332_3576.jpg
Views:	79
Size:	63.9 KB
ID:	36506