RCU Forums - View Single Post - SR Eindecker E1 Winter Build Along…
View Single Post
Old 08-26-2007, 09:31 PM
  #161  
nickbee
Senior Member
My Feedback: (7)
 
Join Date: Mar 2002
Location: Wharton, NJ
Posts: 313
Likes: 0
Received 0 Likes on 0 Posts
Default RE: SR Eindecker E1 Winter Build Along…

So back to building. I left off at the horizontal stabilizer. The manual has you 1st constructing the trailing edge lamination with just dry fitting the ribs for alignment. I’m going to go a little out of order here and glue up the rib laminations 1st. There are 6 of them total so this will take a few steps as I only have enough clamps set up to glue 3 at a time. Like all my other laminations I’m using slow cure finishing epoxy for strength and a warp free cure.
Attached Thumbnails Click image for larger version

Name:	Vt57336.jpg
Views:	11
Size:	130.8 KB
ID:	750473   Click image for larger version

Name:	Hc93608.jpg
Views:	12
Size:	100.7 KB
ID:	750474