RCU Forums - View Single Post - Robart Hinge Point Installation
View Single Post
Old 10-24-2007 | 11:14 AM
  #3  
rheauljj's Avatar
rheauljj
Member
 
Joined: Jun 2007
Posts: 75
Likes: 0
Received 0 Likes on 0 Posts
From: Bridgewater, VA
Default RE: Robart Hinge Point Installation

I'm actually using a pin vise (advice I got from Airfieldsmodels.com site). Would you drill all the holes for both surfaces at one time?...or one set (two sides) at a time?