RE: Goldberg Ultimate 10-300 build
Thanks Garthwood.
I'm building the fuse now and I did some measuring like the instructions say for mounting the engine and it looks like I will have to move the fire wall back about 7/8" using the 150 and the dubro vibration mount in order to keep within the plans outline for the prop washer thru the cowel [:@]
I was wondering if any one else had too. The 150 and the 120 are supposed to be the same in size.
The reason I went with the 150 was for the extra hp I planed on installing a smoke system.