RCU Forums - View Single Post - Morris sledge building question
View Single Post
Old 04-05-2003 | 03:26 AM
  #19  
ChuckAuger
Senior Member
My Feedback: (12)
 
Joined: Dec 2001
Posts: 5,133
Likes: 0
Received 0 Likes on 0 Posts
From: Pampa, TX
Default You just get little gaps..

The strip in the center just gets the center of the rib (chordwise) level with the LE and TE sheeting...not a total capstrip, just enough to jump from LE to TE with the covering.


This just in!
I see the error of my ways!

The pics in Fig #17 & #19 show a servo-sized hole in the sheeting. I mounted mine like the ele/rud servos, thru a hole.

If I had a servo sized hole, I could get the servos out..duh!!

So if you build it per Fig 17 & 19, you will get them out.

I can't, but being an idiot that is my fault.