RCU Forums - View Single Post - Eureka Banshee Build Thread
View Single Post
Old 01-01-2008 | 10:41 PM
  #58  
Free Bird
 
Joined: Nov 2005
Posts: 2,239
Likes: 0
Received 2 Likes on 2 Posts
From: Farmington, CT
Default RE: Eureka Banshee Build Thread

The next step, after the glued has dried, is to trim and sand the T/E flush with the top & bottom sheeting. Moving on to the L/E, it also needs to be trued up for the L/E stock as the sheeting is over hangs the ribs. When done the 1/4" x 1/2" L/E can be glued in place. The first 2 pics show the L/E before sanding, the 3rd pic after sanding and then the stock glued into place.

Attached Thumbnails Click image for larger version

Name:	Sq47167.jpg
Views:	60
Size:	58.5 KB
ID:	839937   Click image for larger version

Name:	Av67404.jpg
Views:	63
Size:	52.4 KB
ID:	839938   Click image for larger version

Name:	Af88873.jpg
Views:	70
Size:	54.0 KB
ID:	839939   Click image for larger version

Name:	Bv59849.jpg
Views:	55
Size:	25.4 KB
ID:	839940