OK GENTS... ONWARD THROUGH THE FOG!!!
TAA BATTLEFIELD PHASE II - " EXPANSION PROJECT" is underway.....
Battlefield is growing to ~ 4000 sqft !!!!!!
AREA WAS MARKED OFF... GRASS/WEED KILLER WAS SPRAYED , RAILROAD TIES WERE SET,,,
ANTI-weed/grass mat was rolled out and set in place... and the original battle area was cleared...
PILE OF JUNK is in the way... BUT IS BEING CLEARED now...
4 MORE DUMP TRUCK LOADS of DIRT/SOIL/SAND are being delivered and SUNDAY is the BIG DAY TO REALLY make the most VISIBLE CHANGES!!!!
WE plan on having a forward airstrip with HANGAR and Radar/ROTATING LIGHT TOWER,
4-5 Bridges, DRY CREEK BED, Running RIVER, Operating GERMAN/AXIS RAIL LINE (G SCALE), Smoke Generators, and loads of buildings, Forrest area, hills, and uneven hilly terrain...
-AFTER-CHRISTMAS SALES have tripled ARTIFICIAL PINE TREE/TREE POPULATION....
-SANTA brought in a G SCALE TRAIN !!!! and over 100FT of TRACK!!!
-MORE PROGRESS SUNDAY...
-TOMAS
[email protected]
www.bomberfieldusa.com
www.vqwarbirds.com
www.rcwarbirds.com
www.shindinmachine.com