Thanks. Yea. All I have left is...... install most of the wiring and the RX, air lines and control valve, install the air charging valve, door closers for the main gear bays, finish the cockpit and pilot, install the canopy, anti rotation pins for the plug in wings, all the control horns and clevises, install the fuelers, permanently install the tail feathers, finish the panel lines on the booms, weather the booms with dirt and smoke trails, install the battery, install the throttle linkage, install the props and spinners, finish the hold-downs for the top hatches, install the flap and aileron servos, paint the inside of the gear bays and cockpit, and possibly install a Twin-Sinc and or gyro, and shoot the whole thing with a clear matt. Piece-o-cake.