RE: BRUCE THARPE-BTE- FLYIN' KING BUILD
End of week two finds the ailerons and flaps built. The fuse is finished, the wings joined. Now the fun part. Trying to place the equipment to keep CG in range using the Saito 120. I'm using two aileron and two flap servos. Each on separate channels. With the bomb bay, I'll be using 8 channels initially.