RCU Forums - View Single Post - KMP Stuka-build details
View Single Post
Old 05-31-2008, 05:37 PM
  #220  
ProScaleRc
Senior Member
 
Join Date: Apr 2006
Location: MosmanNSW, AUSTRALIA
Posts: 358
Likes: 0
Received 0 Likes on 0 Posts
Default RE: KMP Stuka-build details

Hi Dave,

If you are going to CA it, you need to stop-drill the crack first. Stop-drilling is what they do in the aircraft industry when any composite material cracks. You need to drill a hole at each end of the carck (about 3mm). This will stop the crack from travelling.

Cheers,

James