RE: BH T-28 Assembly
Here are the rest of the wing and landing gear install. About 3 hours to make up the wing, including the mods to the Servo plate.
In doing the landing gear install by shear luck I found that there are holes predrilled for the landing gear plastic hold downs.
There is no mention in the instructions regarding these holes. I have shown the approx location for those of you about to build.