About 75% done on the front end.
Going extremely well so far.
1) Working on Front end ( Shock Tower, A Arms, Etcc...
2) Around 1 Hour 30 Minutes
3) 1.5MM Hex Wrench, 2.0MM Hex Wrench, 2.5MM Hex Wrench, 3.0MM Hex Wrench, Spanner, Needle Nose Plires, Blue LockTite.
4) You'll find the body posts in bag 5, the Cap Screws in the screw bag located in Bag 10, and the Ball Joints for the Knuckles in the screw bag of Bag 5.
Well nearly done with the front end, came together easy for the most part, I like the addition of the CNC Lower B Block, instead of Plastic ( Plastic Ones are included too ).
Should be done in the next 10 mins..
Going extremely well so far.
Tho I think it may be time for a Red Bull or a Coffee, 12:44 AM