RE: CMP BF109F BUILDING THREAD
Hi All
Haven't worked on it for a few days till last night.
Pic of the elevator rod exits patched. Ground down with dremel, then 1/16" balsa backing inside fuse with foam layer glued and sanded flush, then 3/4oz. glass epoxy finish layer sanded to finish.
Steve