RE: Falcon 7X build thread
Nacelles installed and glued, decided to finish the stabs today, although it was cold, the garage was heated but there is no way I can do this step inside. All servos done. Now I move onto the internal work, door cylinder installation, all retract/door tube plumbing, RX, fuel tank & lines as well as engine installation.