RE: EDF Predator UCAV from Nitro
A closer look at the fuselage reveals the size, quality finish, construction techniques, and high level of pre-assembly. The T-nuts are already installed, and glued in place, for the gear mains and steerable nose wheel assembly. The battery and servo trays are also pre-installed.