RE: AMR 50 Trainer
It was 50 degrees today. 2 days ago it was 10 degrees.
Today I reinforced the servo trays, added the wire tubes, built up the wing tips and added the spar webs. It was a long day but rewarding. Also I have been talking to the guys at AMR about lengthening the wing joiner to penetrate 2 rib sections rather than 1 on each wing. These guys listen. They are sending me a new longer wing joiner. I boxed in the 2nd rib section on the wings today also for the longer joiner.