RE: Mach 1 Laser Kit Build
Doug,
1) Correct. The crutch formers and sides were in perfect alignment without strings or lines.
2) I was out of Gorilla glue at the time so I used Titebond and kep the fuse sides weighted. The 1/16 ply doublers were glued on with 30 minute epoxy.
3) The nose section should drop in from the front. I am making sure of that prior to gluing. The tank floor needed a small amount of sanding, otherwise things look good so far.
I'm glad you are following along.
Leo