RCU Forums - View Single Post - Elevator linkage
View Single Post
Old 04-09-2009 | 06:45 AM
  #3  
Korps's Avatar
Korps
Senior Member
 
Joined: Oct 2008
Posts: 438
Likes: 0
Received 0 Likes on 0 Posts
From: Wellington, SOUTH AFRICA
Default RE: Elevator linkage

Okay so basically with two pushrods you can do better adjusting (if that is the word too describe it) and it also lessens the stress on equipment when doing maneuvers?

My Edge has the "Torque Rod" method and that was what I have seen on most of the planes I've had a decent look at.

Then when I saw this method (refer too teribble drawing) I started too wonder about what difference it would make.

Would the "Torque Rod" method be sufficient for a Edge 540 .60?
Attached Thumbnails Click image for larger version

Name:	Sq48089.jpg
Views:	141
Size:	9.2 KB
ID:	1176453