RE: SEQUEL, Laser cut kit
Hi Everyone,
I started construction of the Stab today. You can see Ribs 1 & 2 in place with some of the Flying Fork System. Epoxy was added to the Lexan Bearings and to the short Aluminum tube that the fork rides on. After that more ribs were added. More Epoxy was added at the correct locations. After the Epoxy sets up it will be time for the two top Basswood spars and the Leading Edges. After that the bottom spars will be added along with a few fillers, sheeting and Stab tip blocks. More later today.
Dan's Laser Cutting is perfect. The Flying Fork Parts slid into position without issues.
Leo