RE: TIGER 60 Build / Start date 12-05-09
Looks like Imay be wrong about the strentgh of the tiger elevators. The epoxy set up overnight and it appears to have more strength than I anticipated. And obviously when I cover it with Koverall and polycrylic it will be even stronger. I must say I think I would have prefered a steel torque rod. Failure of this component would be bad....very bad. So if anyone has any ideas on how to strenghten this union i would love to hear it.
Also, what does the points over to the left under our names indicate? I have seen anywhere from 100 to something like 190. ???