RE: Deception Build
I have the stab complete and glassed w/ the elevators shaped and hinged but not yet cut to size until after the stab is mounted. I had to make some new wing hold down blocks as the kit's were to short. I didn't have any 1/2" x 1" maple so I just laminated two pieces of 1/4" 5 ply together and cut to size. Since this is plywood, I will be using threaded inserts. I have the stab shimed in place square, level and at 0 degree incedence. I will make up a slurry of 30 min. epoxy and milled fibers to set it in place tonight.