RE: Deception Build
I have the pan sides in place. I had to cut down the side to length to fit. Had the fuse. been right, everything would have fit. I put the bottom on to show the length difference. See how it lines up w/ the filler I put in? All that is left is to put in the tri stock, brass tubes for the screws and I am out of parts. I am now thinking on how I am going to do the elevator control horns. I may go w/ the dowel and 4-40 rod combo or use some Robart swivel control horns. I don't like the kit ones.