RE: Deception Build
The pan is ready for final shaping and fillets. Yes, that is filler in the pan. That's what you get when you drop your wing against the edge of a bench[:@]. The elevators are filtted and sized. You can see were the back of the top deck has been tapered to the plans for the fin area. I didn't like the kit control horn set up, so I went with the 4-40 bolt and dowel route. Nothing beats a good sharp set of Forstner bits for thick balsa. I do change my drill press for high speed when I do this for balsa for a clean hole w/o tear out. The dowels are in place and the elevators are ready for glass. I have used this control horn set up before, you get a lot of adjustment capabilities.