Originally posted by little xtra
CANNISTER friendly,us IMAC guys would like to know if cans could be installed or would it take to much work and weaken the structure???
I just don't see a way to get cans in there. The space where they would go is just not wide enough for 2 side-by-side. A 2-into-1 would work.. but I don't have any experience with how those run.
FWIW.. Hangar 9 ARF's just get better and better. This one is REALLY good.. The only things I have to do on mine now are to mount the engine, set the incidence on the top wing, and rig the rudder. It's basically done otherwise. If I wanted, I could get 55 degrees of elevator travel, and 60 degrees of rudder (like this will EVER need that much).
Going to be a fun airplane I think.. I can't wait.