RE: Redwing 30cc Sbach Build
I did get a little bit done on it after supper.
It did have a few bubbles in the covering on the fuse. They were hard to see till I started to go over the covering with the Iron.
I was pleased to find triangle reinforcements for the firewall.
I got the covering cut out and the two elevator servos mounted and the wood is hardened around the stab alignment dowel and the servo area with CA. I'm going to try and mount the engine tomorrow after flying. Man can't live by building alone. Then I'll fuel proof the firewall and inside the wing socket with 30min. Epoxy thinned with 20% alcohol. It is amazing how much more strength it gives to the wing socket. Also planning on pining the firewall at that time.
Yup That looks like a canister or tuned pipe tunnel. Nicely done feature. But the JC-28 don't need a tuned pipe for power.[sm=thumbs_up.gif]