RCU Forums - View Single Post - COMPLETION OF CMP C-160 EP
View Single Post
Old 01-07-2011 | 01:39 PM
  #1  
LNL
Member
 
Joined: Jan 2003
Posts: 67
Likes: 0
Received 0 Likes on 0 Posts
From: Oak Harbor, Whidbey Island, WA
Default COMPLETION OF CMP C-160 EP

HAVE COMPLETED MY CMP C-160 CARGO CARRIER. HAVE PUT IN THE FOLLOWING
ITEMS:

2 SCORPION S 3026-12(870 KV) MOTORS
2 SCORPION 45 AMP SBEC CONTROLLERS
2 APC-E 9 X 6 THIN ELECTRIC PROPS
1 MAX AMPS 3S 5000 MAH LIPO

FULL SET OF LANDING LITES FROM RC AERODYNE WITH LIGHT
SWITCHES LOCATED ON LEFT SIDE LANDING GEAR HOUSING.
LIGHTS HAVE OWN RX AND BATTERY. BECAUSE OF THIN WING TIPS,
HAD TO MOVE WING LIGHTS IN ON LEADING EDGE OF WING SO AS TO NOT WEAKEN WING.

WEATHER HAS BEEN VERY COLD, WINDY AND WET, AND HAVE NOT FLOWN PLANE YET.

HAVE ATTACHED A FEW PICTURES. BEST, LNL
Attached Thumbnails Click image for larger version

Name:	By76631.jpg
Views:	34
Size:	59.4 KB
ID:	1543697   Click image for larger version

Name:	Bx73643.jpg
Views:	36
Size:	65.3 KB
ID:	1543698   Click image for larger version

Name:	Ch96730.jpg
Views:	33
Size:	76.6 KB
ID:	1543699