Last night was productive.....started on the toeing hook mouning points.....
and then the mounts for the working hatches......
omg, what have I done!
here is the rear of the turret and the shelf for the front of the turret....
front of the turret....
another angle....
and the fitting of one side.....E50 mad!
I better do the other side.....
the e50 has a clubhouse on top of it.........Well the glue has set so back to the lower hull...
I'll see what I can get don this weekend...