RCU Forums - View Single Post - CLARKE TK20 Installation and Configuration
Thread
:
CLARKE TK20 Installation and Configuration
View Single Post
12-16-2012 | 09:26 AM
#
26
tsull
Senior Member
Joined:
Dec 2008
Posts:
315
Likes: 0
Received 0 Likes on 0 Posts
From:
Scottsale, AZ
RE: CLARKE TK20 Installation and Configuration
WIRING PART 1 (Custom Application)
The King Tiger layout has a custom aluminum frame with a front and back bulkhead. The front bulkhead separates the 480 cans and Mato gears from the remainder of the interior. The back bulkhead provides not only the structural rigidity that the Heng Long is lacking (especially when the battery box is removed), but the mounting point for the Control Panel that houses the switches and charge ports.
A word of warning, the Control Panel was neat to build - except I forgot that the turret would interfere with the access cover.
I mounted the two 5000 may batteries toward the front of the KT to keep the tank balanced.
Attached Thumbnails
Reply
Like
tsull
View Public Profile
Send a private message to tsull
Visit tsull's homepage!
Find More Posts by tsull
View iTrader Profile