I ordered a facet 1200 kit which is on it's way (hopefully).
This will be my 1st turbine installation in a model.
Got a question about the fuel system set up,
afaik it uses 2 tanks, how are they rigged up, do I need a UAT or will a conventional "hopper tank" set-up be sufficient?
Which clunks should I use?
Thus far I ran the turbine only on a test stand.
Thanks in advance,
GJ