Fuse repair (cont)
Turned the fuse on her back to assess the damage.
Service tray removed.
The fire wall and removable fire wall are new.
F-3 is cracked at the wing so it will be re-glued and another piece of ply will be sistered to it. A paper template was made for the sister ply.
Once F-3 and the fire wall are epoxied in place, the spruce stringers will be added.
I collected every piece of balsa at the crash site as one never knows what is usable plus it can be used for a template.
Heading to Elkhart in the morning so I'll start on this after I get back.