Inner fuse is all framed up, Went over all the glue joints again and used thin ca inside the front nose to harden and really set the firewall.
Started adding the 1/8" sides. Attaching the front halves first with gorilla glue. Will ca the back halves to the frame once the front has a chance to setup.
Fiberglassed the bottom outside floor for strength and fuel proofing. Only have the turtle deck to skin yet and then all fuse foam parts will be ready.