Thanks Matt. Are u saying the walls will seperate from the floor, not sure what u mean. The floors glued to 3 of the fuse formers with the top of the sides glued to 1/2" foam and then glassed with 2oz cloth.
Worked on the front end today
Got the spinner ring set, added air intake, located needles, and reinforced the firewall with g10.