Originally Posted by
FenderBean
Looking good joe
Thanks Keith. I hope everything looks like something each one of you would do with your own builds. I am hoping with the pictures that I add; someone points out something that could be better or would caution me on doing. I am want to make sure that everything is on the center line running from front to rear of the viper. Today I have done some more work on the airlines and just cleaning it up a little more. As soon as the my other parts come in tomorrow I will be able to get a lot more done. I have to thrust tube back in and drilled the holes for the turbine. What I am doing is I have 8/32 harden screws that I will be using to secure the turbine. I will be using locking nuts on the backside of them. I am taking the nuts and using hysol to keep them in place so that all I have to do is unbolt it if needed. I will add pictures of that soon. My new air cylinders will be in tomorrow which I can finish gear doors and speed brakes. I will have the new electronic plates as well. I have planed out how I am going to do my air seq. and fill lines. I think its going to look sweet. I will have two water traps on each side of the seq and then the fill valves in line with the water traps. Once I have that done tomorrow I will send pictures of that as well. The next few things I need to order is the fuel line, filter, trap, fittings and the CB200.