Originally Posted by
Andrew
I suppose the assumption was that you would read the section on remote sensing carefully -- it does reference sensing on the +5v and +12v rail. I have also seen one supply with a sense wire on ground.
I've converted around 80 or so supplies and run latch and voltage level tests on well over 200. There is a lot of variation across models - some supplies will latch and hold without a preload; some will not. A few will run without reconnecting the sense wires; the majority will not. Stability under load varies considerably -- Antec and Sparkle have performed well. To cover all the bases in the conversion process places some burden on the reader to be equally diligent.
If there is mis-information in the conversion, I would appreciate knowing.
andrew
Originally Posted by
king bily
I suppose the assumption was that you would read the section on remote sensing carefully -- it does reference sensing on the +5v and +12v rail. I have also seen one supply with a sense wire on ground.
I've converted around 80 or so supplies and run latch and voltage level tests on well over 200. There is a lot of variation across models - some supplies will latch and hold without a preload; some will not. A few will run without reconnecting the sense wires; the majority will not. Stability under load varies considerably -- Antec and Sparkle have performed well. To cover all the bases in the conversion process places some burden on the reader to be equally diligent.
If there is mis-information in the conversion, I would appreciate knowing.

Excuse me "King Bily" , BUT , , is there ANY reason why your post is an exact cut and paste of Andrew's post from 2007 ???? Maybe the fact that your a BOT has something to do with it ????
Consider your Bot butt reported , and hopefully banned real soon ......