RCU Forums - View Single Post - 1/6 F-105 Build Thread
View Single Post
Old 06-20-2020, 05:19 PM
  #611  
Viper1GJ
My Feedback: (20)
 
Viper1GJ's Avatar
 
Join Date: Oct 2003
Location: Saint George , SC
Posts: 2,423
Received 330 Likes on 217 Posts
Default

Got back from trip early so second half tank layup prep completed


The small nicks on the plug were wet sanded with 1200 grit paper. Then the 1st tank half placed back on plug


Vinyl tape applied over center joint. The flash tape would not stretch over compound curves and left wrinkles which would lock the new part on the plug. I used vinyl tape that stretched over the joint and stayed smooth. Then the flash tape was used t cover the first half part.


Clear packing tape used to secure plug into the box for stability as before


4 coats of Partall past wax rubbed on plug and buffed off


One coat of PVA brushed on plug. Next is the epoxy and glass layups.

Last edited by Viper1GJ; 06-20-2020 at 05:22 PM.
The following users liked this post:
bonefishfool (06-20-2020)